Kostnadskalkyler med osäkerhetsanalys och subjektiva sannolikheter : En fallstudie på Biogas Mellannorrland

Detta är en Kandidat-uppsats från Mittuniversitetet/Avdelningen för informationssystem och -teknologi

Sammanfattning: The purpose with this study is to show how the subjective uncertainty analysis can be applied to the cost estimates and examine how the attitudes towards risk budgeting of construction projects works. Biogas Mellannorrland is based on a case study and focuses on four location options for the biogas plant. For each option, a cost estimate in form of a fixed cost and variable cost elements, where the latter are uncertain. Pearson-Tukey method have been applied as a method to estimating subjective probabilities. An assumption is made so that the uncertain costs are normally distributed, where the parameters’ mean and standard deviation collected from respondents indicating percentiles at 5% and 95% for doubtful cost elements. In order to identify the project managers risk attitude, the risk premium method will be used to calculate where the expected value is produced by Pearson-Tukey method. The expected value is subtracted with certainty equivalent, which consist of the budgeted amount. The study was conducted through interviews in order to obtain the costs and the subjective probabilities. The study results show that it is difficult to determine which option is the best, or the worst, by just looking at the expected value. The risk premium shows that each option is a risk averse choice for the project managers, since the risk premium was greater than zero.

  HÄR KAN DU HÄMTA UPPSATSEN I FULLTEXT. (följ länken till nästa sida)