En studie av byggnadsnämndens kontroll och tillsyn vid uppförande av flerbostadshus

Detta är en Kandidat-uppsats från Institutionen för teknik och design

Sammanfattning: When a new building is constructed, or some changes are taking place in the already existing building, it is required according to PBL  chapter 8 that the developer applies for planning permissions at the building committee in that municipality where the real estate is located. In the planning permission, the documents of the current building are examined.   The developer will appoint a quality manager that helps the developer to ensure that all necessary controls are done and that the requirements in these are met. The developer has the final responsibility to ensure that the building is built according to all requirements and rules. The building committee establishes a control plan that shows which controls have to be carried out and which certificates and documents have to be sent in during the time of the construction. This study aims to finding out which documents that will be submitted at the construction of a new building, according to the laws found in PBL, if these documents are required and if they are examined of the municipalities before the building is approved.

  HÄR KAN DU HÄMTA UPPSATSEN I FULLTEXT. (följ länken till nästa sida)