Analys av centralt beslutad extern tredjepartslogistik i Vallastaden : En fallstudie gällande värdeskapande för byggentreprenörens logistikverksamhet

Detta är en M1-uppsats från Högskolan i Jönköping/JTH, Byggnadsteknik

Sammanfattning: Purpose: External logistics coordination was decided after a long procurement process while parts of the project Vallastaden already started construction. The external logistics company creates and implements a logistics solution in a short time. The municipality has no formal connection requirements on developers, but has transferred to the third-party logistics to contract with the developers. The goal is to examine how the implementation of the external solution contract affects residential building and how an external third-party logistics solution works value creation for the building contractor. Method: For data collection observation and interviews have been used as methods of work. Findings: In order to create favourable condition for a builder and/or contractor in the implementation of a centrally decided external third party logistics solution requires:  Early involvement of third-party logistics contractor in the planning stage with the motto "first and last on site" Clear and well-developed conditions for procurement of connectivity requirements, and the possibility of adaptation of the technical solution according to the customer identified needs. Open and continuous dialogue at all levels within the organizational structure. Implications: The complexity of how building projects should plan their logistics allows a handling of the issue at an early stage in the project is crucial. If the potential of the third party logistics for construction projects should be used needs to be early dialogue between the parties involved which the project's conditions have to control how the service should be designed. Limitations: The problem area and the number of actors involved in the external third-partylogistics make it difficult to pinpoint exact events that contributed to the situation has become in Vallastaden. The authors have not found the source of why it has been difficult to implement third-party logistics solution at an early stage in Vallastaden. What emerged during the process is that it needs to be sought answers higher up in the organizational structure of Vallastaden, but there is work boundaries made this a priority away and therefore not addressed in this report. Selected methods aimed solely at Skanska role in Vallastaden. Alternative viewpoints from different developers and construction contractors in Vallastaden has partly been highlighted in logistics meetings. It is important to point out that the work contains only a limited number of viewpoints on centrally approved third party logistics based on the many actors who are part of the project Vallastaden.

  HÄR KAN DU HÄMTA UPPSATSEN I FULLTEXT. (följ länken till nästa sida)