Sökning: "Capacitated Lot Sizing Problem with Sequence Dependent Setup Times SLSP-SDST"
Hittade 1 uppsats innehållade orden Capacitated Lot Sizing Problem with Sequence Dependent Setup Times SLSP-SDST.
1. Optimization of Production Scheduling at IKEA Industry Hultsfred
Master-uppsats, Linköpings universitet/Kommunikations- och transportsystem; Linköpings universitet/Tekniska högskolanSammanfattning : IKEA Industry has factories in several locations where one location is in Hultsfred, Småland. IKEA Industry Hultsfred produces IKEA:s wardrobe collection PAX. In 2018, 2.8 million wardrobes were manufactured in Hultsfred. LÄS MER
Resultatsidor:
1