1. A study investigating the factors that causes delays in construction equipment projects in UX/HMI area
Master-uppsats, KTH/Väg- och spårfordon samt konceptuell fordonsdesignSammanfattning : This research study investigates the factors contributing to delays in construction equipment projects, specifically in the User Experience (UX) and Human-Machine Interface (HMI) area, with a particular focus on projects conducted at the company Volvo Construction Equipment. The study incorporates a literature review, a mixed-methods approach combining qualitative and quantitative analysis, and in-depth discussions. LÄS MER
2. Standardization Beyond Compliance : A Study on BIM Standardization in the Swedish AEC Industry from a Contractor’s Perspective
Master-uppsats, KTH/Ledning och organisering i byggande och förvaltningSammanfattning : BIM Standardization holds significant importance within the AEC industry and contractors serve as one of the primary users of standards. This thesis undertakes an exploration of the incentives that drive contractors toward BIM standardization. LÄS MER
3. Samordnad varudistribution för privatpersoner
M1-uppsats, Högskolan i Borås/Akademin för textil, teknik och ekonomiSammanfattning : Kungsbacka kommun har sedan 5 år tillbaka infört samordnad varudistribution, men fram tills nu har det enbart skett för kommunala verksamheter. En ökad folkmängd samt infrastruktur ökar behovet av smarta logistiklösningar för att miljön inte ska påverkas mer än nödvändigt. LÄS MER
4. The Final 50 Feet Problem in Gothenburg - A MAMCA study on the situation regarding deliveries to multi-tenant multistory buildings in Gothenburg
Master-uppsats, Göteborgs universitet/Graduate SchoolSammanfattning : Purpose: The purpose is to study the situation regarding the Final 50 Feet in Gothenburg and if any of the solutions found in literature can be implemented. As there are several actors connected to deliveries with diverging goals a Multi-Actor, Multi-Criteria Analysis (MAMCA) has been used to include the views of the different stakeholders to increase the feasibility and ensure that the results are legitimate and feasible to implement. LÄS MER
5. Implementering av BIM-Manual – En riktlinje hur BIM-manualen tillämpas i verkligheten
Kandidat-uppsats, Malmö universitet/Fakulteten för teknik och samhälle (TS)Sammanfattning : Ett byggprojekt innehåller fyra skeden, förstudie, projektering, produktion och förvaltning. Projekteringsskedet är hela designprocessen där ritningar och beskrivningar skapas för att sedan kunna bygga och förvalta den tänkta byggnaden. LÄS MER