Sökning: "Integrated Project Delivery IPD"

Hittade 4 uppsatser innehållade orden Integrated Project Delivery IPD.

  1. 1. Implementation of Level of Development for BIM Collaboration in Timber Building Subsystems Design: A Case Study of I-Joist Construction Elements

    Uppsats för yrkesexamina på avancerad nivå, Luleå tekniska universitet/Institutionen för samhällsbyggnad och naturresurser

    Författare :Isabell Gustafsson; [2024]
    Nyckelord :BIM; I-Joist; LOD; Level of Development; Timber Building Subsystems;

    Sammanfattning : Due to time, cost, and environmental challenges, wood has become a more common building material even for more complex buildings. Implementing the concept of Level of Development (LOD) on timber structures could provide a tool for BIM collaboration that may save cost and time, and in the early stages mediate wood as an available building material. LÄS MER

  2. 2. Implementering av Integrated Project Delivery i den svenska byggsektorn : En vidareutveckling av Samverkan

    Uppsats för yrkesexamina på grundnivå, Uppsala universitet/Institutionen för samhällsbyggnad och industriell teknik

    Författare :Alex Ljung; Henrik Jonsson; [2020]
    Nyckelord :Integrated Project Delivery; IPD; Samverkan; Partnering; Samarbetsformer; Kontraktering; In3prenör;

    Sammanfattning : This thesis examines an American form of partnering, Integrated project Delivery (IPD) for the purpose of implementing it in the Swedish construction industry. To do this the current Swedish standard of partnering, Samverkan, is compared to IPD. LÄS MER

  3. 3. Integrated Project Delivery

    M1-uppsats, Luleå tekniska universitet/Institutionen för samhällsbyggnad och naturresurser

    Författare :Anton Niemi; Stefan Johansson; [2019]
    Nyckelord :IPD;

    Sammanfattning : .... LÄS MER

  4. 4. Integrerade arbetsmetoder med Virtual Design and Construction

    Master-uppsats, KTH/Fastigheter och byggande

    Författare :Moa Ahlbäck; [2018]
    Nyckelord :Virtual Design and Construction VDC ; Integrated Project Delivery IPD ; Integrated Concurrent Engineering ICE ; Collaboration; Integration; Virtual Design and Construction VDC ; Integrated Project Delivery IPD ; Integrated Concurrent Engineering ICE ; Samarbete; Integrering;

    Sammanfattning : Virtual Design and Construction (VDC) introducerades tidigt på 2000-talet för att främja ett arbete med datorbaserade modeller samt involvering av produktionsplanering i designfasen. VDC är ett koncept som idag har anammats inom många bygg- och konsultföretag för att utveckla arbetet med Building Information Model (BIM), innovationer och samverkan inom byggprojekt. LÄS MER