Sökning: "Lean Visual Planning"
Visar resultat 1 - 5 av 28 uppsatser innehållade orden Lean Visual Planning.
1. Planning of a Production layout for a Swedish manufacturing company : A case study at REHOBOT Rotex AB
Magister-uppsats, Jönköping University/JTH, ProduktionsutvecklingSammanfattning : Plant layout is the heart of any production line because if the layout is not properly laid, there can be numerous consequences. Planning a layout for an SME is the most crucial and tedious job for a manufacturer because it is time-consuming and sometimes a costly process. LÄS MER
2. Development of production layout : A proposal of Lean model for a manufacturing company by using Value Stream Mapping
Kandidat-uppsats, Karlstads universitet/Fakulteten för hälsa, natur- och teknikvetenskap (from 2013)Sammanfattning : A general aim among manufacturing companies is to create a high value for the customer by using few resources and gain profit as a result. Tools and methods from Lean can be used for streamlining the production in order to achieve a resource-effective, flexible, and fast production process. LÄS MER
3. Flödesstudie - Produktion av prefabricerade byggelement
Uppsats för yrkesexamina på grundnivå, Umeå universitet/Institutionen för tillämpad fysik och elektronikSammanfattning : Inom byggbranschen uppstår utmaningar med att uppnå effektiva produktionsflöden då kunder förväntar sig stor flexibilitet och efterfrågar produkter med varierande innehåll och utformning. Denna utmaning försvåras av att många aktörer ofta är inblandade i kedjan fram till en färdig byggnad. LÄS MER
4. Production Planning With the Last Planner System on Construction Projects in Sweden : An Exploratory Case Study of Challenges and Improvement Measures
Master-uppsats, KTH/Fastigheter och byggandeSammanfattning : One of the main assumptions in conventional production process is that each component or part of the production process can be controlled separately as if they are not dependent on anything. This assumption gives rise to problems such as need of effective collaboration with different actors and constraints in budgets. LÄS MER
5. Mapping and improving the after sales flow in a high-tech assembly plant : A case study of the aftermarket at Saab Järfälla
Uppsats för yrkesexamina på avancerad nivå, Luleå tekniska universitet/Institutionen för ekonomi, teknik och samhälleSammanfattning : This thesis report is the final element of the Master of Science degree in Industrial Design Engineering at Luleå University of Technology, conducted between January and September 2017 at Saab AB Surveillance in Järfälla, Sweden. The purpose of this thesis project was to analyze the current situation inside production of aftermarket products with an aim to create an extensive mapping of the current situation. LÄS MER