Sökning: "Production layout"

Visar resultat 1 - 5 av 303 uppsatser innehållade orden Production layout.

  1. 1. Indonesian Rural Electrification : What is the most sustainable solution?

    Master-uppsats, KTH/Energiteknik

    Författare :Claudia Vannucchi; [2021]
    Nyckelord :biomass power; rural electrification; Indonesia; Calliandra; Sulawesi; Indonesia; microgrid; renewable microgrid; sustainable development; biomassakraft; landsbygdens elektrifiering; Indonesien; Calliandra; Sulawesi; Indonesien; mikronät; förnyelsebart mikronät; hållbar utveckling;

    Sammanfattning : The Sustainable Development Goal n°7 is calling for a prompt response to guarantee affordable and clean energy for all. While the electrification rate is rapidly increasing around the world, much work still remains to achieve electricity access in remote areas or Non-Interconnected Zones, such as the numerous small islands that compose Indonesia. LÄS MER

  2. 2. Study of Production Drifts Stability and Assessment of Reinforcement Requirements at LKAB Konsuln Test-Mine Levels 436 and 486 Using Geologic Structures Data, and Modelling Software – Dips and Unwedge:  a Part of dp1 Project (Mine Layout and Technology) of the Sustainable Underground Mining (Sum) Project

    Master-uppsats, Uppsala universitet/Institutionen för geovetenskaper

    Författare :Oludare Joseph Olufe; [2021]
    Nyckelord :Drift stability analysis; underground excavation reinforcement; underground mining stability assessment; geologic structures; wedges modelling; rock mechanical analysis; Unwedge program; Dips program;

    Sammanfattning : Study of Production Drifts Stability and Assessment of Reinforcement Requirements at LKAB Konsuln Test-Mine Levels 436 and 486 Using Geologic Structures Data, and Modelling Software - Dips and Unwedge:  a Part of dp1 Project (Mine Layout and Technology) of the Sustainable Underground Mining (Sum) Project Oludare Joseph Olufe Global population has been on exponential increase over the past half century. The population explosion is driving massive urbanization and infrastructure developments across the globe, which result in huge demand for metals, especially steel. LÄS MER

  3. 3. Developing an optimization model to determine AGV fleet size given the capacity of machines and vehicles in the production industry

    Master-uppsats, Blekinge Tekniska Högskola/Institutionen för industriell ekonomi; Blekinge Tekniska Högskola/Institutionen för industriell ekonomi

    Författare :Milad Zaher; Ale El Ghazzi; [2021]
    Nyckelord :AGV; FMS; AGV fleet size; Optimization; Machine capacity; Production; AGV; FMS; AGV fleet size; Optimering; Maskinkapacitet; Produktion;

    Sammanfattning : Background: In the present competitive environment manufacturing firms have shifted their production from mass production to mass customization. In this line, a flexible manufacturing system (or FMS) has evolved to the changing requirements. LÄS MER

  4. 4. Optimering av produktionslina på tillverkande enhet i Sverige

    Uppsats för yrkesexamina på grundnivå, Uppsala universitet/Institutionen för samhällsbyggnad och industriell teknik

    Författare :Jonathan Hyldéen; [2020]
    Nyckelord :bottleneck; lean; line balancing; production flow; production layout; production optimization; tied capital; WIP; flaskhals; kapitalbindning; lean; linjebalansering; PIA; produktionsflöde; produktionslayout; produktionsoptimering;

    Sammanfattning : Denna studies syfte är att leverera ett förslag på hur ett tillverkande företag i Sverige kan öka sin kapacitet, sitt genomflöde och flexibilitet i en manuell produktionslina. Produktionsgolvet är trångt för de anställda på grund av stora lagernivåer intill produktionslinan. LÄS MER

  5. 5. Assembly flow design and process data digitalization for Process Industries : Flow and Line balancing with Simulation for Paper and Pulp Instruments with digital Information management

    Master-uppsats, KTH/Industriell produktion

    Författare :Goushik Nattanmai Ganesh Babu; [2020]
    Nyckelord :;

    Sammanfattning : The ABB Lorentzen and Wettre in Kista produces Paper and Pulp Testing Instruments for Paper Mills worldwide. The unit has product range of over 140 instruments. In the production there is significantly longer throughput times compared to the demand takt in the assembly of instruments since they are working in a Fixed position layout. LÄS MER