Sökning: "examensarbete produktion och logistik"

Visar resultat 1 - 5 av 44 uppsatser innehållade orden examensarbete produktion och logistik.

  1. 1. Digitalisation of Predetermined Motion Time Systems : An Investigation Towards Automated Time Setting Processes

    Master-uppsats, KTH/Produktionsutveckling

    Författare :Jesper Gans; [2023]
    Nyckelord :Predetermined Motion Time Systems PMTS ; Computer Vision CV ; Machine Learning ML ; Förutbestämda metod-rörelse system; Datorseende; Maskinlärning;

    Sammanfattning : Time setting in production operations is necessary to properly takt and balance the flow of assembly and logistics. Time setting activities is also crucial to achieve an optimised, healthy and ergonomic assembly and logistics operation. LÄS MER

  2. 2. Borta bra men hemma bäst?

    Kandidat-uppsats, Lunds universitet/Företagsekonomiska institutionen

    Författare :Elias Alhar; Karl-Oscar Giertz; Måns Wirfelt; [2022]
    Nyckelord :Entreprenöriellt beslutsfattande; Supply chain management; Lägesfaktorer; Startup; Produktion; Entrepreneurial decision-making; Location factors; Manufacturing; Business and Economics;

    Sammanfattning : Title: There’s No Place Like Home?: A qualitative multiple-case study about how Swedish startups choose location of production Seminar date: June 3rd, 2022 Course: FEKH99, Bachelor Degree Project in Entrepreneurship and Innovation Management, Business administration, Undergraduate level, 15 University Credit Points Authors: Elias Alhar, Karl-Oscar Giertz och Måns Wirfelt Advisor: Joakim Winborg Keywords: Entrepreneurial decision-making; Supply chain management; Location factors; Startup; Manufacturing Research question: Which location factors are valued by decision-makers in startups when choosing location of production and why do these factors differ between startups? Purpose: The purpose of the study is to contribute with increased understanding of how decision-makers in startups argue when choosing location of production. Methodology: Qualitative multiple-case study executed through semi-structured interviews. LÄS MER

  3. 3. Design and Implementation of Downtime Management System for Assembly Production : Software specification and practical challenges

    Master-uppsats, KTH/Skolan för elektroteknik och datavetenskap (EECS)

    Författare :Gustav Dowling; [2022]
    Nyckelord :Overall equipment efficiency; Assembly manufacturing; Automotive Industry; Supervisory Control and Data Acquisition; Information Systems; Downtime management; Overall Equipment Efficiency; Monterings produktion; Fordonsindustri; Supervisory Control and Data Acquisition; Information Systems; Stopptidshantering;

    Sammanfattning : The usage of information technology (IT) systems has become an integral part of assembly manufacturing. Supervisory control and data acquisition (SCADA) systems are widely used in order to control production cycles and monitor equipment such as conveyor belts. LÄS MER

  4. 4. Digitalization of Volvo Group's International Manufacturing Supply Chain

    Master-uppsats, Lunds universitet/Teknisk logistik

    Författare :Fredrik Greftén; Anton Gunneberg; [2021]
    Nyckelord :Digitalization; knock-down manufacturing; Industry 4.0; supply chain transformation; automotive industry; Technology and Engineering;

    Sammanfattning : Background: The International Manufacturing division (IM) at Volvo Group Trucks Operations (Volvo) in Gothenburg handles the supply of Volvo’s international manufacturing efforts. This is done using knock-down manufacturing where complete trucks are sent in pieces to be assembled at location. LÄS MER

  5. 5. Development of an Assembly Setup and Investigation of Material Feeding Concepts for the Production of Construction Equipment Cabs

    Master-uppsats, KTH/Industriell produktion

    Författare :Bhargav Kumar; [2020]
    Nyckelord :Line Balancing; Internal Logistics; Kitting; Mixed-model assembly line; Linjebalansering; Intern logistik; Kittning; Mixad-modellmonteringslinje;

    Sammanfattning : Volvo CE at Hallsberg, Sweden is specialized in the production of cabs for construction equipment. The organization employs the one-line (mixed-model assembly) method, where cabs for different products are all assembled on the same main line. Operations on the main line are not standardized for all products. LÄS MER