  1. 1. Simulation as an Enabler for ProductionSystem Development within the Indoor Vertical Farming Industry

    Master-uppsats, Mälardalens universitet/Akademin för innovation, design och teknik

    Författare :Anwar Abbas; Ömer Faruk Acar; [2023]
    Nyckelord :Indoor Vertical Farming; Production System Development; Industry 4.0; Facility Layout Design; and Simulation;

    Sammanfattning : With the increase in food consumption, new ideas, and technologies began to be developed. Inaddition, the developments generated by Industry 4.0 technologies have started to be applied tothe entire manufacturing sector and the indoor farming industry, which is currently trending. LÄS MER

  2. 2. Användningen av BIM-verktyg och Lean-principer för optimerade tidsplaner i byggprojekt : En fallstudie av implementering

    Kandidat-uppsats, Malmö universitet/Fakulteten för teknik och samhälle (TS)

    Författare :Yazeed Alkhatib; Mohammad Alshammaa; [2023]
    Nyckelord :Critical Path Method CPM ; Line Of Balance LOB ; Vico Office; Building Information Modeling BIM ; Lean principles.;

    Sammanfattning : Inom byggbranschen är förseningar i byggprojekts leveranser vanligt förekommande och utgör ett utmanande problem. För att övervinna detta problem krävs en utvecklad och noggranna tidsplaner som följs av alla berörda parter. LÄS MER

  3. 3. Effektivisering av byggprocessen med hjälp av lean : En fallstudie på ett företag med prefabricerat byggande

    Uppsats för yrkesexamina på grundnivå, Högskolan i Gävle/Energisystem och byggnadsteknik

    Författare :Eman Alhajjaj; Marvin Sanchez; [2022]
    Nyckelord :Byggnadsteknik; Effektivisering; Lean; Prefabricerade; Modulhus; Konstruktion; Byggprocess; Eliminering; The Toyota Way; Lean principer.;

    Sammanfattning : The increasing housing shortage occurring in society has for a long time created a great need to build housing quickly and cost-effectively. This has led to more and more industrialization of its building process, where housing is manufactured in modular form in the factory. LÄS MER

  4. 4. Linking warehouse with production - Determining where and how to design a pull system at Tetra Pak

    Master-uppsats, Lunds universitet/Teknisk logistik

    Författare :Gustav Östlund; Alexander Hantelis; [2022]
    Nyckelord :Material flow; Information flow; Warehousing; Production; Lean; Design science research; Technology and Engineering;

    Sammanfattning : Problem description: Tetra Pak is currently using a push system for most movements of material between their component warehouse, the yard and the PPCL production site and are interested in how a potential implementation of a pull system could affect the efficiency of the material flow. Purpose:The purpose of this master thesis is to create decision– and design propositions for determining when it is appropriate to utilize a pull system and how a pull system can be designed at Tetra Pak PPCL. LÄS MER

  5. 5. Green Kaizen : En kvalitativ studie om framgångsfaktorer för kontinuerliga förbättringar av avfall med hjälp av Green Performance Map (GPM) på AstraZeneca

    Kandidat-uppsats, KTH/Hållbar produktionsutveckling (ML)

    Författare :Kristian Kannel; Christoffer Forsberg; [2020]
    Nyckelord :;

    Sammanfattning : Efterfrågan på hållbarhet ökar i samhället, och även genom organ som FN presenteras ambitiösa mål angående utsläppsnivåer. Dessa faktorer ligger till grund för det ökade behovet av miljörelaterade förbättringar, särskilt på miljöfarliga anläggningar inom den tillverkande industrin. LÄS MER