Sökning: "steel-concrete composite bridge"
Visar resultat 1 - 5 av 8 uppsatser innehållade orden steel-concrete composite bridge.
1. FE-Modelling of Composite Girder tests
Uppsats för yrkesexamina på avancerad nivå, Luleå tekniska universitet/Institutionen för samhällsbyggnad och naturresurserSammanfattning : Many of the existing steel-concrete bridges may need to be strengthened, as heavier vehicles areallowed on the Swedish roads. These bridges could possibly be strengthened by post-installingshear connectors. The shear connectors may enhance the load-bearing capacity through a higherdegree of composite action between the steel and concrete interface. LÄS MER
2. Strengthening of non-composite bridges by Partial Composite Action
Uppsats för yrkesexamina på avancerad nivå, Luleå tekniska universitet/Institutionen för samhällsbyggnad och naturresurserSammanfattning : A common bridge type is the steel-concrete bridge where the concrete deck is built over steel girders. In many earlier designs the bridge type was often built as non-composite, which means that the concrete deck and the steel girder has no shear connection at the steel-concrete interface and therefore bend as individual components. LÄS MER
3. Non-Linear FE-Analysis of a Composite Action Girder with Coiled Spring Pins as Shear Connectors
Uppsats för yrkesexamina på avancerad nivå, Luleå tekniska universitet/Institutionen för samhällsbyggnad och naturresurserSammanfattning : For bridges to cope with increased requirements such as increased loads, strengthening work can be carried out. In cases where older steel-concrete bridges do not have a composite action, an alternative is to create composite-action to achieve a higher flexural strength. It is introduced by post-installing shear connectors. LÄS MER
4. A New Bridge Proposal - Road Bridge with a Cross-Laminated Timber Slab
Uppsats för yrkesexamina på avancerad nivå, Lunds universitet/Avdelningen för KonstruktionsteknikSammanfattning : In this thesis, a new bridge type is proposed. It is a steel bridge with a slab of cross-laminated timber elements. The bridge is intended for road traffic, and it has a span length of 26 m. It aims to be competitive when a short construction time is important. LÄS MER
5. Numerical analysis and model updating of a steel-concrete composite bridge : Parametric study & Statistical evaluation
Master-uppsats, KTH/Bro- och stålbyggnadSammanfattning : In the year 2006, only 10 years after the steel- concrete composite bridge, Vårby bridge was built, fatigue cracks were found during an inspection. To further investigate the reasons and the potential danger of the cracks, an investigation under the commission of the Swedish Transport Administration was issued in 2009. LÄS MER