Detta är en Kandidat-uppsats från Högskolan i Jönköping/JTH, Maskinteknik; Högskolan i Jönköping/JTH, Maskinteknik; Högskolan i Jönköping/JTH, Maskinteknik

Författare: Elisabeth Gyllengren; Peter Olsson; Daniel Lantz; [2008]

Nyckelord: ;

Sammanfattning:

This examination work is performed at the institution of industrial economy and production at Jonkoping technical university, for JELD-WEN Door Solutions plant in Forserum.

Today the focus in the company is on to reduce their inventories binding of capitals as well as inventory of products and that includes to get a good control of the supply and handling of material which is of great importance.

JELD-WEN Door Solutions is one of the worlds leading producers of windows and doors and the head-office is located in Oregon, USA.

A great number of wooden doors are manufactured by the company in varying of constructions, classifications and performance.

The production of the plant in Forserum has a project- and customer focus manufacturing where only internal doors are produced. The overall market they are concentrated on is to different institution such as schools, hospitals etc.

The purpose of this work is to investigate possibilities to improvement of material- and production control at JELD-WEN. The report will handle the master production schedule to and from the production divisions within manufacturing industry. Focus will be on the way for information- and material flows from arrival, transport within the company and further on to customers.

Further a map of the flow was performed which gave a clearer picture of the connection between the flow of information- and material for the manufacturing process. On the basis of the mapping of the flow, the group discovered that the flow of material had some improvement potential. The group has also chosen to look on the final assembling process to investigate if it’s able to do improvements here also.

The report is concluded with discussion and suggestions of improvement considering the flow of information- and material. The suggestions of improvement that is given are suggestions that how JELD-WEN can work with the handling and the structure of material to production.

  HÄR KAN DU HÄMTA UPPSATSEN I FULLTEXT. (följ länken till nästa sida)