Optimisation of an aeronautic production line through the managementof tools and the shortage of items

Detta är en Master-uppsats från KTH/Flygdynamik

Författare: Alexis Philippe; [2019]

Nyckelord: ;

Sammanfattning: This thesis work is part of a process to ensure the production ramp-up of the A320neo aircraft pylons at Airbus Saint-Eloi factory (Toulouse). The aim of the project was to optimise the production management in order to sustain the transition to a serial production of the assembly lines. The objective of the thesis work was to develop a model to prevent the downtime of the production lines caused by the shortage of the assembly lines or the unavailability of tools on workstations.Firstly, the work investigates the existing models in order to understand the causes of stocks variability. Performance of tools was determined with the Markov chain model. Then, the work provides a method to forecast production needs in terms of items and tools. An algorithm was developed to collect and process the data on the existing resources in order to compare it to the forecasted needs. Solutions were designed to identify the causes of the shortages on the production lines. In addition, by analysing the trends of the shortage of stocks and the availability of tools on workstation, a forecast of long term constraints for production is possible. The method showed promising results to identify and manage the missing items and tooling on the workstations.

  HÄR KAN DU HÄMTA UPPSATSEN I FULLTEXT. (följ länken till nästa sida)