Effektivisering av kvävereningen vid bioblock A, Kungsängsverket

Detta är en Uppsats för yrkesexamina på avancerad nivå från Uppsala universitet/Institutionen för informationsteknologi

Sammanfattning: The most common type of nitrogen removal in wastewater treatment plant is to use abiological treatment. When biological treatment is used, the two most common processes fornitrogen removal is pre and post denitrification. In the biological treatment A (BA) atKungsängsverket the nitrogen removal process used is intermittent aeration. Whenintermittent aeration is used, the wastewater is aerated at specific time intervals. This allowsboth nitrification and denitrification to occur in the same water volumes. It is of great interestto find a control strategy for controlling the air supply which is both cost effective and leadsto low emissions of nitrogen. The aim of this project was to improve the intermittent aeration at Kungsängsverket, Uppsala.The project was divided into two parts. The first part consisted of experiments carried out infull scale on the plant and the second part was a simulation study. In the experimental partdifferent time intervals for aeration were evaluated. The aim of the simulation part was toevaluate different control parameters and to find which parameters that should be used for anoptimal control strategy. The results showed that the best combination of aerated time and un-aerated time is 50minutes aerated and 50 minutes unaerated. It is recommended that the wastewater should beadded in the beginning and after half of the plant. The simulation results showed that thecontrol strategy can be improved by using a PI-regulator. The experiments and thesimulations both showed clear signs of variations in the inflow during the day. Because of thisit is recommended to establish a control strategy which easily can change the aeration timedepending on low and high flows.

  HÄR KAN DU HÄMTA UPPSATSEN I FULLTEXT. (följ länken till nästa sida)