Stängning av plankorsningar – med eller utan järnvägsplan?

Detta är en Kandidat-uppsats från Högskolan i Gävle/Samhällsbyggnad

Sammanfattning: The present essay set out to investigate the work methodology of closing level crossings and chart the process from the initial need to close the level crossing up to completed closing of level crossing, furthermore; to investigate which factors affect the projects efficiency and progress both in terms of planning and implementation. This essay sets out to answer the following questions: “What is the current way of dealing with closing off level crossings and when would the implementation of a railway plan be useful?” and “How does project-implementation look like when dealing with the project of removal of level crossings in regard to time and cost?”. When it comes to repealing an overpass easement in order to be able to close a level crossing, a railway plan can be established to facilitate such easement measures. Although it does not directly imply "construction of the railway", if it is to be cancelled without support in a railway plan, the conditions of protection in Chapter 5 and Chapter 7 of the FBL must be fully applied. The method used was partly interview and partly study of railway plans and cadastral dossier. Twelve interviews were conducted, of which seven represented the Swedish Transport Agency and five persons who represented the National Land Survey, who were considered to fulfil the response required to answer the questions to an enough extent. There were only a limited number of railway plans which included only the closure of level crossings. However, there were a number of railway plans that dealt with the closure of level crossings, but then in connection with other measures which by law are the construction or rebuilding of railways. The united nations global sustainable objective strive to reach 17 objectives before the year 2030 wereof objective 11 is as follows: “Sustainable cities and societies”, which was considered to be connected with this essays problem formulation. It has emerged from the result that there are both pros and cons of applying railway plan in connection with the closure of level crossings. What can be stated after the implementation of the study is that the Swedish Transport Administration has a desire to implement more railway plans at complicated level crossings and the National Land Survey Office sees certain advantages from a handling perspective to applying a railway plan.

  HÄR KAN DU HÄMTA UPPSATSEN I FULLTEXT. (följ länken till nästa sida)