DIGITALA HJÄLPMEDEL : Avvikelsehantering och kvalitetssäkring med hjälp av Autodesk BIM 360 Field En studie riktad mot Skanska Sverige AB, Region Hus Stockholm Bostäder

Detta är en Uppsats för yrkesexamina på grundnivå från Mälardalens högskola/Akademin för ekonomi, samhälle och teknik; Mälardalens högskola/Akademin för ekonomi, samhälle och teknik

Sammanfattning: The purpose of the work was to analyze the existing deviation management process and how the process could be optimized using BIM 360 Field on behalf of Skanska Sverige AB. This is because the deviation management on several projects is not carried requirements at present, which is to use BIM 360 Field. The analysis was aimed at Region Hus Stockholm Bostäder. The goal of the work was that the work would serve as an aid to obtain better quality assurance with focus on BIM 360 Field as a tool. The work was a qualitative work and the methods used to answer the questions first consisted of a literature review and then interviews and project visits. The result showed that deviation management took place in different ways within the region where a few used BIM 360 Field as an aid. According to respondents, some of the most common reasons why the tool was not used were the individual approach to the tool and that there was no proper structure or common working method for how the tool would be applied. The respondents themselves considered that the tool seemed good and have good potential to act as an aid, if Skanska created better structure and knowledge of the tool. As a suggestion as to how the tool could be implemented, respondents replied that the introduction of BIM 360 Field would be arranged closer to production start and have more follow-up meetings and continuation courses. Another suggestion that was made to create better engagement among employees was to go on visits to projects that are incorporated when it comes to BIM 360 Field, this to more easily understand how the tool can help in their daily work. The conclusions that can be drawn from the results and the literature study were that BIM 360 Field can improve the quality management of the projects, and that the employees at Skanska Hus Stockholm Bostäder handle deviations in several ways.

  HÄR KAN DU HÄMTA UPPSATSEN I FULLTEXT. (följ länken till nästa sida)