Swedish hydropower : A literature study about Swedish hydropower, environmental impact and EU: s Water Framework Directive

Detta är en Magister-uppsats från Högskolan i Gävle/Avdelningen för bygg- energi- och miljöteknik

Sammanfattning:

In Sweden, EU: s Water Framework Directive led to an investigation that started in April 2012 by the Swedish government, called Vattenverksamhetsutredningen freely translated to "Water Activities Survey", with the purpose to investigate the Environmental Code’s rules concerning water activities and water plants. The survey is divided into 3 reports, two sub-reports and a final report. One of the sub-report is focused on Swedish hydropower and the investigators found that many hydropower plants have old permits. One suggestion in the survey was to reconsider old permits so they would become consistence with today’s Environmental Code. There have been discussions regarding whether Sweden will lose much of its electricity production from hydropower as an outcome if the survey’s suggestions becomes reality.

The aim with this literature study is to investigate how the EU: s Water Framework Directive and the Water Activities Survey will affect Swedish hydropower and if there will be a decrease in electricity production as an outcome if the suggestions made in the survey becomes reality.

The results in this literature study shows that there will probably be a decrease in production for Swedish hydropower, but with how much is hard to say because the Swedish government has not yet decided what they will do with the suggested actions in the Water Activities Survey. A comparison is done with Sweden’s import and export statistics between the years 2001-2014 with a predicted loss of 13 TWh per year, which is a number taken from a survey made by Vattenfall. A comparison with a loss of half of 13 TWh per year is also done. Between the years 2001 and 2014 Sweden imported electricity 6 out of 14 years and exported electricity 8 out of 14 years. If adding the predicted loss of 13 TWh per year to the import and export statistics, Sweden would have had to import electricity 12 years and export 2 years. If adding a loss of 6.5 TWh per year Sweden would have had to import electricity 8 years and export 6 years.

The conclusions is that Sweden will have to import a lot more electricity if only looking at import and export statistic if the loss of electricity is between 6.5-13 TWh per year.