Estimation of the characteristic in-situ compressive strength class of concrete structures - A case study of the Skuru bridge

Detta är en Master-uppsats från KTH/Bro- och stålbyggnad

Sammanfattning: It is inevitable that Structures become older and their intended use changes or the structuralcodes regulations change. In some regions the damage from seismic activities is a possibility.It becomes, therefore crucial to assess the structural capacity of such structures. The purposeof this study is to assess the different methods used for testing and estimating thecharacteristic in-situ compressive strength which is the most vital parameter required instructural assessment. The focus of the study is for existing structures where there is no prior knowledge about theconcrete strength. This study first investigates and evaluates the merits and demerits of thesemethods for investigation of the condition of in-situ compressive strength of concrete inexisting structures. A case study of the Skuru bridge that was built in 1914 was utilized forthis study. The study is based on information of the construction data and some results fromprior investigation performed by the company COWI. Afterwards, non-destructive tests werecarried out with the UPV and Rebound hammer to assess the quality of the concrete. In addition, the study assesses the use of different interpretation methods with regards toreliability and practical application. The results were interpreted in accordance to theEuropean codes, Swedish codes and other interpretation methods. The difference of theresults from the different interpretation methods are compared and evaluated for reliabilityand efficiency. The test results confirmed that the concrete consisted of the same strength class. However,the results from the different interpretation methods are dissimilar. The reason for obtainingdifferent results is because the methods depend on different methodologies. The studyshowed that some methods can sometimes overestimate the results and become unsafe forstructural assessment. On the contrary, the other methods can yield lower but safer estimates. Moreover, the use of small number of cores is evaluated for various methods. The reasons arebecause in practice, the preference is to avoid large number of cores. As a result, it isrecommended to apply care and proper judgment in selection of the methods andinterpretation of the results. It is also recommended to consider the methods with respect tothe aim of the investigation, their limitations and assumptions.

  HÄR KAN DU HÄMTA UPPSATSEN I FULLTEXT. (följ länken till nästa sida)