Ombyggnad av Klockarforsen

Detta är en Master-uppsats från Uppsala universitet/Elektricitetslära

Sammanfattning: The water level at Hjälta power station in Faxälven varies depending on the water flow that passes through the power station. The varying water level causes head losses, lesser energy generation and loss of income. The varying water level is caused by a short but narrow and shallow part of the river, known as Klockarforsen. To increase the water flow and decrease the resulting head losses, it is possible to dredge the stream bed in Klockarforsen in order to achieve a greater depth.  By using a sonar to map the bathymetry in Klockarforsen, it has been possible to create a model of this part of the river. The model has been constructed and processed in ArcGIS and HEC-RAS, in order to examine how a dredging would affect the water level, head losses, energy generation, income and retention water levels.  The results show that a dredging to a depth of four or six meters could raise the water level and the head height at Hjälta power station with an average of 0.32 and 0.41 meters, respectively. During the period between 2014-2019, 1.11-3.84 GWh more energy would have been generated annually if Klockarforsen had been dredged. Which means that the income for the power station would have increased by between MSEK 0.39-1.3 per year. The increased energy generation and income are considerable, but in terms of how much energy and income is generated annually, the figures are more modest. The energy production and income increase by between 0.13-0.3 percent annually. 

  HÄR KAN DU HÄMTA UPPSATSEN I FULLTEXT. (följ länken till nästa sida)