Arbetsberedning i produktion : Kommunikation och informationsöverföring mellan produktionsledning och yrkesarbetare inom organisationen Peab Sverige AB

Detta är en Kandidat-uppsats från Högskolan i Jönköping/JTH, Byggnadsteknik

Sammanfattning: Abstract Purpose: The construction industry's productivity in Sweden is low and one of the major causes of this is the lack of work preparation. A study showed that 45 percent of the fault causes could be linked to work preparation and accounted for up to 30 percent of the error costs. Work preparation is a tool for efficient and safe execution of work, but despite good foundation, the use of it does not work at present. The lack of use of work preparation is to a large extent a result of poor communication and information exchange between production management and occupational workers in production. The aim of the work is to investigate communication and information exchange between production management and occupational workers in the production. Identifying deficiencies in communication and information exchange, how they can be rectified. As well as provide improvement suggestions for the use of work preparation as a tool between production management and occupational workers. Method: To achieve the goal, a qualitative case study on three building projects has been carried out. The methodology has been semi structured interviews with team members involved in the work preparation, observation of meetings, document analysis of the organization's work preparation and a literature study to gain knowledge of the factors that cause deficiencies in communication and information exchange of the team members involved in the work preparation. Findings: The identified underlying causes of communication and information exchange failures are too little information about work preparation, unclear how to implement it and too few tools. Production management does not realize the value of work preparation, which means that the time required for a good work preparation is not set aside. Implications: An adequate work preparation is an important factor in increasing the productivity of construction projects. In order to achieve an adequate workforce the organization must have stronger guidelines and more tools to streamline it and appoint the responsible party to implement them. Production management needs to realize the value of a work preparation and set aside the time required for it to be beneficial. Limitations: The limitations on the work have been a requirement based on the time perspective of the work. The work is considered despite the limitation to Peabs office in Jönköping applicable to other projects. The work has not had the purpose of changing the work preparation but focuses on the use of it, how it is worked and used. Reflecting that work preparation is a general term not only used in the construction industry, the result is generalizable to not only building projects but in all areas of work that require a comprehensive work preparation in an efficient and flexible manner.

  HÄR KAN DU HÄMTA UPPSATSEN I FULLTEXT. (följ länken till nästa sida)