On-Board Data Aquisition System : Conceptual Design of an Airdrop Tracking System

Detta är en Master-uppsats från Linköpings universitet/Maskinkonstruktion

Sammanfattning: This thesis is, on behalf of Saab AB, a pre-study of possible on-board solutions for position measuring during store separation tests aimed for the test and evaluation of JAS 39 Gripen. The purpose is to replace the present ground-based system in order to achieve more effective trials regarding time and economy. Three different concept development methodologies were investigated in order to find the most suitable one for this thesis. Those were merged into one adapted methodology containing the following phases; \textit{Planning}, \textit{Function Analysis}, \textit{Concept Generation} and \textit{Concept Evaluation}. The work progressed as the methodology states, and the highest amount of work was dedicated to the Planning phase. The requirements and desiderata for the system were produced with an agile process, resulting in the Construction Specification List that eventually became the basis for the Concept Generation phase. Knowledge about the technical theory needed to solve the problem was obtained in parallel with the Function Analysis and Concept Generation. The most adaptable techniques to measure position were found out to be with the use of the Global Positioning System (GPS) or Inertial Navigation System (INS). After an extensive work with the Concept Generation in parallel with a continuously updated Construction Specification List, three concepts were developed. One concept is based on GPS, the second one on INS and the third one is a combination of GPS and INS. All three concepts shares the same telemetry system and casing, which fulfills the requirement of simple installation and possibility to install in different stores. In the final phase, Concept Evaluation, a comparison between the concepts was performed. Advantages and disadvantages was listed and the fulfillment of requirements was investigated. All three concepts were handed over to Saab in order to let them decide which concept(s) to further develop.

  HÄR KAN DU HÄMTA UPPSATSEN I FULLTEXT. (följ länken till nästa sida)