Sökning: "WAMS."
Visar resultat 1 - 5 av 8 uppsatser innehållade ordet WAMS..
1. Detection and location of HVDC commutation faults from PMU data
Master-uppsats, Lunds universitet/Industriell elektroteknik och automationSammanfattning : Commutation Failures in LCC HVDC converters is a topic that is normally addressed from the component perspective, looking at converters’ internal signals. How these commutation failures affect the outer AC network is not deeply understood yet. LÄS MER
2. Är chefen en kvinna? : Högskolestudenters attityder till kvinnor som chefer
Kandidat-uppsats, Mälardalens högskola/Akademin för hälsa, vård och välfärdSammanfattning : Forskning har länge bedrivits inom området gällande kvinnors hinder att nå högre chefspositioner. Könsroller, stereotypiska egenskaper, kategoriseringar och negativa attityder tycktes vara centrala i problematiken. LÄS MER
3. Utvärdering av förmågan hos Wet Area Mapping (WAM) att beskriva markbärigheten på skogsmark intill vattendrag
Master-uppsats, SLU/Dept. of Forest Ecology and ManagementSammanfattning : Att påverka marker nära vattendrag och sjöar medför en särskilt stor risk att förorena och försämra vattenkvaliteten i vattendragen. Risken att påverka kvaliteten i vattnet är kopplat till markens fukthalt, bl. a. via att ökad fukthalt medför ökad risk för körskador. LÄS MER
4. Traffic Modeling and Evaluation of QoSschemes in Wide Area MonitoringSystem
Master-uppsats, KTH/Industriella informations- och styrsystemSammanfattning : To prevent a power grid from having disturbances that may, in a worst case scenario, blackout entire countries, Transmission System Operators (TSO) want to be able to see what happens in different parts of the network faster, to have time to do the necessary changes and regulate the power grid. For this reason, a new technology called PMU-based Wide Area Monitoring System (WAMS) has been introduced to allow the real-time monitoring of the power grid. LÄS MER
5. Traffic Modeling and Evaluation of QoS schemes in Wide Area Monitoring System
Master-uppsats, KTH/Industriella informations- och styrsystemSammanfattning : To prevent a power grid from having disturbances that may, in a worst case scenario, blackout entire countries, Transmission System Operators (TSO) want to be able to see what happens in different parts of the network faster, to have time to do the necessary changes and regulate the power grid. For this reason, a new technology called PMU-based Wide Area Monitoring System (WAMS) has been introduced to allow the real-time monitoring of the power grid. LÄS MER