Identifiering av mervärden i EPC-projekt

Detta är en Kandidat-uppsats från KTH/Industriell ekologi

Författare: Carl Andersson; Linus Olausson; [2015]

Nyckelord: ;

Sammanfattning: In this report a study is carried out with the aim to identify added values of EPC projects implemented in schools in order to increase the interest of EPC projects on the market. The report examines how the planned maintenance, supervision, maintenance and corrective maintenance is affected, how insurance premiums and terms are affected, the indoor environment and how the tasks of the operating staff is changing. A literature study of energy savings, energy use in schools, maintenance and insurance as well as how energy efficiency improvements are related to the Swedish environmental objectives has been made. Visits were carried out in Ludvika, interviews were also carried out with operation technicians and local strategists in Ludvika as well as employees of insurance companies. Schools often have neglected maintenance and problems with ventilation and indoor environment. Schools also have a large energy saving potential due to their low utilization, mainly because they are empty parts of the year. All Swedish schools could reduce their electricity consumption by 1 TWh per year, which in money equivalents to the salary costs of about 2,000 teaching positions. 8 schools in Ludvika and 10 schools in Piteå who has completed EPC projects have been studied. The time periods studied are seven years for Ludvika, 2006 – 2012, and for Piteå five years, 2010 – 2014. The data of fault reports and maintenance costs are taken from the municipalities, and descriptions of schools and EPC projects have been received from Caverion who has carried out the EPC projects. Data for maintenance has to some extent been selected in consultation with employees at the municipalities. The number of error reports in Piteå schools have shown a slight downward trend with a peak while the EPC project was carried out and one year after. Ludvika has shown an upward trend in maintenance costs, but this is probably due to previously accumulated maintenance. The amount of corrective maintenance is reduced, but only after the project when newly found errors have been fixed and the systems have been properly adjusted. The tasks related to supervisory and maintenance has changed when remote control of systems was installed which leads to a better overview and simplifies troubleshooting. The indoor temperature got more stable, but only after they fixed the weaknesses revealed in connection with the operational optimization. However, there are complaints in Ludvika of low temperatures, but it is caused the target temperature being set too low by the municipality. Insurance is only marginally affected, and only when damage prevention measures are implemented in the properties, which is not done in the studied properties. However, the underlying data sets are too small and over a too small time period to prove any certain changes. An added value identified is the ability to use EPC projects as a tool to address deferred maintenance in the real estate portfolio outside the normal budgetary framework while achieving energy savings. 

  HÄR KAN DU HÄMTA UPPSATSEN I FULLTEXT. (följ länken till nästa sida)