Energy retrofit of an office building in Stockholm: energy performance analysis of the cooling system

Detta är en Master-uppsats från KTH/Installations- och energisystem

Sammanfattning: The increasing attention towards energy efficiency issues has triggered an important process involving the renovation of existing buildings and, at the same time, the creation of recognized certifications assuring the quality of the projects. In line with this trend, the Sweco headquarters, an office building characterized by 24700 m2 of floor area and located in Stockholm, was totally retrofitted in 2012 and obtained the Gold rating after being assessed with the Miljöbyggnad certification procedure. The HVAC system was a key element of the retrofit project since one of the final aims was to combine high indoor environment standards with efficient system performances. However, even if the quality of the design is certified, it is possible that, under real operating conditions, complex systems behave differently from the expectations and adjustments are necessary to correct the emerged gap. To achieve this goal, it is essential to identify the points of weakness of the system by carrying out an energy performance analysis, which is the core of this project. In fact, after providing an overview of the building and the retrofit, this work focuses on the analysis of the cooling system installed in the Sweco building and proves the importance of adopting a step-by-step approach to the problem. Therefore, an increasing level of detail characterizes each step of the analysis, whose final aim is to highlight potential aspects to be improved and create a baseline to test possible solutions.

  HÄR KAN DU HÄMTA UPPSATSEN I FULLTEXT. (följ länken till nästa sida)