Utveckling av en ny tillverkningslina

Detta är en Kandidat-uppsats från JTH, Maskinteknik

Sammanfattning: This report contains results of our study at CTC in Ljungby. CTC produces heating products such as boilers, heat pumps and additional products to their heating systems. The purpose of the report is to make a proposal how CTC will supply their new production line for heat pumps with materials. The proposal includes a production layout and a scheme for how to place the material in the production storage. The new production line will produce two different products and both of them have several variants. The line will also have a mixed flow, so the products can be produced in a random order. These conditions demand that the production line has great flexibility and that the material to all the variants can be stored in the production storage. With these conditions as input we made a layout proposal to the company. They already had an own layout, but wanted another opinion. After the proposal was made the work continued with further developing of the company layout. When the production layout was established we began to examine the material for the two products. During the examination we got knowledge of where in the production line the material was used and also how they stored the material today. With help of this information the material were placed in the production storage. We also decided in which packing the different components would be stored in and how many packings there would be for each component in the production storage.

  HÄR KAN DU HÄMTA UPPSATSEN I FULLTEXT. (följ länken till nästa sida)