Sökning: "Vector mediator"
Hittade 4 uppsatser innehållade orden Vector mediator.
1. Complementarity of high energy and high intensity experiments for dark photon benchmarks
Master-uppsats, Lunds universitet/Partikel- och kärnfysik; Lunds universitet/Fysiska institutionenSammanfattning : Physical phenomena that are unexplained by the Standard Model (SM) of particle physics, are the subject of the area of research known as physics Beyond the Standard Model (BSM). BSM physics contains many Dark Matter (DM) theories which have emerged; from particles such as axions, neutrinos, and Weakly Interacting Massive Particles (WIMPs), to primordial black holes and others. LÄS MER
2. Signal background interference effects in lepton trident events with a new low mass mediator
Master-uppsats, Lunds universitet/Teoretisk partikelfysik - Geonomgår omorganisationSammanfattning : In this project we present a phenomenological study of signal to background interference effects in leptonic tridents produced in parton showers. The interference effects are introduced by linking matrix element corrections of a kinetically mixed dark photon model to the parton shower Dire. LÄS MER
3. Study of Dark Matter Models in Astrophysics and Particle Physics
Master-uppsats, Lunds universitet/Partikel- och kärnfysik; Lunds universitet/Fysiska institutionenSammanfattning : From astrophysical and cosmological observations, it is known that most of the matter in the Universe is dark. This matter could be explainable by new particles, not included in the Standard Model of Particle Physics. LÄS MER
4. Search for Dark Matter in the Upgraded High Luminosity LHC at CERN : Sensitivity of ATLAS phase II upgrade to dark matter production
Master-uppsats, Linköpings universitet/Institutionen för fysik, kemi och biologi; Linköpings universitet/Tekniska högskolanSammanfattning : The LHC at CERN is now undergoing a set of upgrades to increase the center of mass energy for the colliding particles to be able to explore new physical processes. The focus of this thesis lies on the so called phase II upgrade which will preliminarily be completed in 2023. LÄS MER