Feasibility of DC microgrids for rural electrification

Detta är en Master-uppsats från Högskolan Dalarna/Energiteknik

Sammanfattning: DC system and DC microgrids are gaining popularity in recent times. This thesis suggests a method to state the workability of a DC based PV system using the softwares Simulink, PVsyst and HOMER. The aims of this project include suggesting a DC based architecture, finding out the performance ratio and a cost analysis. The advantages of the DC based system, the cost benefits associated with it and its performance will determine its feasibility.   Not many softwares have the functionality to simulate DC based PV systems. PVsyst is considered as one of the most sought-out softwares for the simulation of PV systems. It can simulate a DC based PV system but has a lot of limitations when it comes to the architecture and voltage levels. Due to these factors, the results from softwares Simulink, Homer and PVsyst are used to calculate the performance ratio of the suggested DC system.    The simulation of the DC system involves modelling of a DC-DC converter. DC-DC converters are used in HVDC transmission and are being considered for small scale and medium scale microgrids. The DC-DC boost converter is coupled with a MPPT model in Simulink. P and O algorithm is chosen as the MPPT algorithm as it is simple and widely used. The Simulink model of PV array and MPPT based boost converter provides the power output at the needed voltage level of 350V. The input for the Simulink model is obtained from the results of HOMER. The inputs include solar irradiation data and cell temperature. The same input data is used for the simulations in HOMER and PVsyst. The performance ratio is obtained by combining the power output from Simulink with the other aspects of the system from PVsyst. The performance ratio is done only for the month of January due to the limitations in Simulink. The performance ratio is found out to be 65.5 %.   The cost estimation is done for the distribution and power electronics aspects of the system. It is found out that the cost associated with the conductors will have an impact on the total cost only if the conductors used for distribution is more in length. The cost associated with the power converters will make a difference in total cost only if the system is within the range of 100kW. The study shows the workability of the PV based DC system based on the above mentioned aspects

  HÄR KAN DU HÄMTA UPPSATSEN I FULLTEXT. (följ länken till nästa sida)