Sökning: "stokastiskt kortsiktigt planeringsproblem"
Hittade 1 uppsats innehållade orden stokastiskt kortsiktigt planeringsproblem.
1. Short-term planning and operational profitability of multi-ESS hybrid wind farms
Master-uppsats, KTH/Skolan för elektroteknik och datavetenskap (EECS)Sammanfattning : The unpredictability and variability of wind power generation can pose an economical risk to the wind power producer when participating in the day-ahead market and delivering the committed generation. These risks come from the creation of imbalances due to a mismatch between the sold and real generation fed to the grid. LÄS MER
Resultatsidor:
1