Utvärdering av den biologiska reningen av processavloppsvattnet vid GE Healthcare i Uppsala

Detta är en Uppsats för yrkesexamina på avancerad nivå från Institutionen för geovetenskaper

Sammanfattning: GE Healthcare operates in Uppsala (Sweden) and develops systems, equipments and medium to purify medical substances. Discussions with the local authority concerning planed far-reaching changes and upgrades of the biological process techniques for sewage management, aroused the question about revising the terms of permit for the activity. Therefore it seemed necessary to evaluate a newly installed biological process technique, which is the background of this thesis. The evaluated biological treatment process was built in 2003 and consists of a biological reactor filled with moving bed carriers with a high surface area for biological growth. At the time of the project the biological wastewater treatment plant consisted of a flow equalization facility and two following parallel biological processes; a biological reactor with moving bed carriers and a tower trickling filter. The aim of this thesis was to survey the function of the biological reactor with respect to the reduction of organic matter. Further to clarify which circumstances that have a negative effect on the organic reduction. During the three forthcoming years, an extensive reconstruction of the biological wastewater treatment facility will be accomplished. During the construction period the flow equalization will be very limited. Therefore an emission forecast with respect to organic matter was performed comprising the construction period during the years 2005, 2006 and 2007. This to estimate the safety margin to the emission standard during the construction period. Several parameters were surveyed during the project, water temperature, pH, plural nutrition elements, flow, oxygen concentration, suspended solids, organic load and microbial activity. At two occasions, the parameters were extensively studied during a 24-hour period respectively. Two capacity experiments were performed in order to evaluate the organic reduction at different organic loads. The obtained results together with an estimation regarding the organic load performed by AB Ångpanneföreningen were used for the emission forecast. The forecast considered two cases, operation with and without dosage of a flow with high organic content from the local solvent recycling facility (called T10-dosage). According to the forecast, the emission standard will be fulfilled during an average month regarding the organic load. This without T10-dosage and with an average reduction of 55 %. To fulfill the standard during a month with maximum organic load, a reduction of 65 and 75 % will be required in the cases without and with T10-dosage respectively. The organic reduction is negatively effected by lasting loads of 7 kg CODfilt/m3 or higher, or by a great increase of the load in a short period of time. Sporadic peaks regarding the organic load appeared to have temporary or no negative effects on the reduction. Flow variations during evenings, nights and weekends caused variations in the organic load with negative effect of the reduction rate. The oxygen concentration in the biological reactor has a conclusive significance of the reduction rate, a lower concentration than 2 mg/l affects the reduction rate in a negative way. The buffering capacity in the biofilm reactor showed to work excellently, the pH value varied between 6.8 and 8.9. There is an immediate risk of temperatures over 40oC during the construction period. This could have a negative influence of the organic reduction. Individual measured temperatures of 38oC did not have a negative effect on the reduction rate. The amount of suspended solids varied a lot in the outflow from the biological reactor and will continue to do so during the construction period.

  HÄR KAN DU HÄMTA UPPSATSEN I FULLTEXT. (följ länken till nästa sida)