Sökning: "Just-in-time distribution"
Visar resultat 11 - 15 av 17 uppsatser innehållade orden Just-in-time distribution.
11. Lean Warehousing - Gaining from Lean thinking in Warehousing
Master-uppsats, Lunds universitet/FörpackningslogistikSammanfattning : This master thesis has been written during the autumn of 2007 and in the month of January 2008. It investigates how the Lean philosophy can be used in Warehousing businesses. Further it gives example of tools that can help Warehousing companies to become Leaner in their business. LÄS MER
12. Majsensilage : partikelstorleksfördelning och hygienisk kvalité
L3-uppsats, SLU/Dept. of Rural Buildings and Animal Husbandry [LBT]Sammanfattning : Fieldstudys on 22 farms (23 silos) to study relationships between the actual particle size of the maize silage and the theoretical length of cut. The measure of theoretical length of cut were stated by the farmers and not measured by us. Particle size of maize silage was determined using the New Penn State Forage Particle Separator. LÄS MER
13. Materialdistribution i ett tillverkningsföretag : en fallstudie av PartAB
L3-uppsats, SLU/Dept. of EconomicsSammanfattning : The purpose of this project is to study Partab's material distribution process, furthermore identify critical problem areas within the company. Further the aim is to provide suggestions to new work procedures regarding material distribution and related processes. Appropriate literature has been used as a support in this process. LÄS MER
14. Transportflödesanalys på Peab/Skandinaviska Byggelement
Master-uppsats, Institutionen för teknik och naturvetenskap; Tekniska högskolanSammanfattning : Detta examensarbete utgör resultatet av en studie på uppdrag av byggföretaget Peab och dess dotterbolag Skandinaviska Byggelement. Syftet med studien har varit att undersöka transporternas påverkan till följd av en högre grad prefabricering vid byggnationer av flerfamiljshus. LÄS MER
15. Distribution Banverket PDÖ
Master-uppsats, Institutionen för teknik och naturvetenskap; Tekniska högskolanSammanfattning : This thesis was made at Banverket Produktion region Öst (Banverket Production, Eastern region), who have decided to restructure their warehousing for spare parts. The basic problem is the amount of spare parts with long stock rotation cycles, which represents a great costs for the warehousing. LÄS MER