  1. 1. The road to an accurate cost estimation in engineer-to-order manufacturing - A case study of cost estimation accuracy within advanced technology development in a defence and security company

    Master-uppsats, Göteborgs universitet/Graduate School

    Författare :Lawin Anwar; Sandra Barría Colliander; [2023-07-03]
    Nyckelord :Engineer-to-order; new product development; cost management; cost engineering; cost estimation error; cost overruns; cost estimation accuracy; project management;

    Sammanfattning : Estimating the costs of a project is a vital part of manufacturing organisations as estimations are what set the basis for the price of the products. Precise estimates allow for effective planning and resource allocation, ensuring that the necessary materials, equipment, and personnel are available to complete the project on time and within budget. LÄS MER

  2. 2. Implementering av ett digitalt projektledningsverktyg inom en kommunal verksamhet : En studie om eventuell implementering av ett projektledningsverktyg

    Uppsats för yrkesexamina på grundnivå, Mittuniversitetet/Institutionen för naturvetenskap, design och hållbar utveckling (2023-)

    Författare :Sara Nafaa Qacuson; [2023]
    Nyckelord :project management; efficiency; public sector; digital tool; Projektledning; effektivitet; offentliga sektor; digitalt verktyg;

    Sammanfattning : Etablering av projekt som arbetsform har ökat i samband med den snabba samhällsutvecklingen. Byggprojekt plågas ofta av förseningar och kostnadsöverskridande vilket leder till försämrat projektkvalité. Projektbaserade verksamheter styr och leder sina projekt genom specifik och anpassad projektstyrmodell. LÄS MER

  3. 3. Upphandlingsprocessen i Byggbranschen : En kvalitativ analys av metoder och strategier i upphandling

    Kandidat-uppsats, Högskolan i Halmstad/Akademin för företagande, innovation och hållbarhet

    Författare :Erblin Morina; Isak Bengtsson; [2023]
    Nyckelord :moral-hazard; procurement procedure; procurement strategies; partnering; collaboration; project performance;

    Sammanfattning : The construction industry is a complex sector that places high demands on project management, planning, and implementation. Significant progress has been made in recent decades regarding the delivery of extensive construction projects, including the adoption of new building techniques, improved risk management systems, and enhanced safety measures. LÄS MER

  4. 4. Blueprint and Beyond : Integrating BIM and LPS within Lean Construction on Production Process

    Master-uppsats, KTH/Fastigheter och byggande

    Författare :Tosin Samuel Oyeniyi; [2023]
    Nyckelord :Last Planner System; Building information modeling BIM ; Lean construction; Last Planner System; Building information modeling BIM ; Lean construction;

    Sammanfattning : The construction industry faces numerous challenges, such as schedule delays, cost overruns, and rework, which can impact project success and profitability. The key motivation for this report is to explore and understand the potential benefits and implications of integrating Building Information Modeling (BIM) functionalities with the Last Planner System (LPS). LÄS MER

  5. 5. Orsak och förklaring till tids- och kostnadsöverskridande i små och okomplicerade infrastrukturprojekt : En fallstudie på Trafikverkets verksamhetsområde Investering region Öst i Uppsala

    Master-uppsats, Uppsala universitet/Industriell teknik

    Författare :Fredrik Linder; [2023]
    Nyckelord :cost overrun; infrastructure projects; optimism bias; causes; explanations; kostnadsöverskridande; infrastrukturprojekt; optimistisk bias; orsaker; förklaringar;

    Sammanfattning :   Infrastructure projects frequently exceed their budgets in both time and cost, which often burdens the taxpayers. A significant percentage of these projects are neither complex nor unique, where the contract sum is a fraction of the contract sum of known megaprojects however has a higher percentage of cost overruns. LÄS MER