  1. 1. FE-Modelling of Composite Girder tests

    Uppsats för yrkesexamina på avancerad nivå, Luleå tekniska universitet/Institutionen för samhällsbyggnad och naturresurser

    Författare :Holger Berggren; Bergstedt Ola; [2024]
    Nyckelord :shear connector; post-installed; coiled spring pins; composite girder; partial composite action; finite element method;

    Sammanfattning : Many of the existing steel-concrete bridges may need to be strengthened, as heavier vehicles areallowed on the Swedish roads. These bridges could possibly be strengthened by post-installingshear connectors. The shear connectors may enhance the load-bearing capacity through a higherdegree of composite action between the steel and concrete interface. LÄS MER

  2. 2. Study of demolition processes for prestressed concrete bridges: Kalix bridge

    Uppsats för yrkesexamina på avancerad nivå, Luleå tekniska universitet/Institutionen för samhällsbyggnad och naturresurser

    Författare :Lundin Hanna; [2022]
    Nyckelord :Kalix bridge; demolition methods; demolition process; FEM analysis; Kalixbron; rivningsmetoder; rivningsprocesser; FEM analys;

    Sammanfattning : Bridges in Sweden are getting older and some of them are reaching their designed life span. With an older generation of bridges, the need for a good understanding of demolition processes increase. The Kalix bridge is planned to be demolished and will be used as a case study in this thesis. LÄS MER

  3. 3. Strengthening of non-composite bridges by Partial Composite Action

    Uppsats för yrkesexamina på avancerad nivå, Luleå tekniska universitet/Institutionen för samhällsbyggnad och naturresurser

    Författare :Johan Tjernberg; [2022]
    Nyckelord :Composite action; Composite bridges; Partial shear connection; Partial Composite Action; Shear connectors; Coiled Spring Pins;

    Sammanfattning : A common bridge type is the steel-concrete bridge where the concrete deck is built over steel girders. In many earlier designs the bridge type was often built as non-composite, which means that the concrete deck and the steel girder has no shear connection at the steel-concrete interface and therefore bend as individual components. LÄS MER

  4. 4. Long-term deformation of balanced cantilever bridges due to non-uniform creep and shrinkage

    Master-uppsats, KTH/Betongbyggnad

    Författare :Sidra Akbar; Mathias Carlie; [2021]
    Nyckelord :Balanced cantilever bridges; box girder cross-section; concrete; non-uniform creep and shrinkage; Bažant’s B4 model; Eurocode 2; long-term deformations; finite element analysis; Freivorbau broar; lådtvärsnitt; betong; ojämnkrypningoch krympning; BažantsB4 modell; Eurokod 2; långtidsdeformationer; finita element analys;

    Sammanfattning : Balanced cantilever bridges have historically experienced excessive deformations. Previous researchsuggeststhat the cause may be due to differential thickness in the box girder cross-section and underestimation of creep and shrinkage. LÄS MER

  5. 5. Modelling Time-Dependent Effects for Segmentally Constructed Prestressed Concrete Bridges

    Master-uppsats, Lunds universitet/Avdelningen för Konstruktionsteknik; Lunds universitet/Institutionen för bygg- och miljöteknologi

    Författare :Niclas Elfving; Joel Sunesson; [2021]
    Nyckelord :Concrete; Creep; Segmentally constructed; Prestressing; Post-tensioning; Viscoelastic; Eurocode; Finite Element; Shell elements; Beam elements; Time-dependant; Steel relaxation.; Technology and Engineering;

    Sammanfattning : Tidsberoende effekter, såsom krypning, krympning och stålrelaxation, är ofta svåra att prediktera när det kommer till förspända betongkonstruktioner. Krypning som ett fenomen är komplicerat och förenklas därför i gällande byggnormer (Eurocode), för att underlätta konstruktörens arbete. LÄS MER