Kapacitetsberäkningsmodell för materialhanteringsflödet på Ericsson i Kumla

Detta är en Uppsats för yrkesexamina på grundnivå från Ekonomiska institutionen

Sammanfattning: Ericsson’s factory in Kumla, Modules Kumla, became a hub for radio modules and micro base stations, which enables mobile communication through radio base stations, in 2004. Because of this the factory focuses more on the logistics operations. This has led to a need to be able to plan the capacity for the materials handling system. This master thesis has therefore been performed at Modules Kumla to develop a capacity calculation model for the material handling flow during the autumn of 2005. The work has contained a mapping of the material handling flow regarding to which activities was performed and how much time they consumed. By using data from the enterprise information system and simple linear regression a capacity calculation model was developed to calculate the amount of staff needed given a specific production and delivery rate.

  HÄR KAN DU HÄMTA UPPSATSEN I FULLTEXT. (följ länken till nästa sida)