Sökning: "Manufacturing Postponement"

Visar resultat 1 - 5 av 9 uppsatser innehållade orden Manufacturing Postponement.

  1. 1. Sänka bundet kapital i ett mellanlager : -En studie utförd i syfte att finna orsaken till varför lager bildas för att därefter presentera en eller flera åtgärder som bidrar till minskat bundet kapital i lager

    Kandidat-uppsats, Högskolan i Jönköping/JTH, Industriell organisation och produktion

    Författare :Gustav Svensson; Jesper Nilsson; [2018]
    Nyckelord :Lean; Tied up capital; Warehouse; Stock; Improvements; MTS; MTO; Tied up capital; Lead-time; Lead-time mapping; Variations; Flow efficiency; Postponement; Just-in-Time; Make-to-stock and Make-to-order; Lean; Ledtid; Lager; Ledtidskartläggning; Variationer; Flödeseffektivitet; Senareläggning; Just-in-Time; Make-to-order; Bundet kapital;

    Sammanfattning : Purpose – Globalization affects all producing companies with increased complexity in production, stock management and never ending customer demands. The customers of today have a greater range of suppliers than before with even more products to choose from which puts the customer in a strong position. LÄS MER

  2. 2. Reducing the tied up capital through investigation of production postponement and inventory

    M1-uppsats, Lunds universitet/Produktionsekonomi

    Författare :Hanne Olsson; Lina Hedvall; [2013]
    Nyckelord :tied up capital; postponement; inventory management; safety stock; finished goods inventory; risk-pool; demand variability; Technology and Engineering;

    Sammanfattning : VI Delimitations The company has several product families but only one is investigated in this project. There are today two main warehouses at the production site, the warehouse for raw material and the one for finished goods, where only the latter was studied. There are other places within the company where capital could be tied up as well, e.g. LÄS MER

  3. 3. Choosing The Right Postponement Strategy : A Focus On E-commerce and Postponement

    Master-uppsats, IHH, Marketing and Logistics; IHH, Företagsekonomi

    Författare :Sofie Lindholm; Julien Balland; [2012]
    Nyckelord :Postponement; E-commerce; Full Postponement; Logistics Postponement; Manufacturing Postponement; Full Speculation; CODP;

    Sammanfattning : Background: the concept of postponement primarily aims at reducing uncertainty, not to say eliminate it. It is achieved by postponing processes until the required information be- comes available. LÄS MER

  4. 4. Flexibility in Supply Chain. A case study of ICA AB (Non-Food/Clothing) and sub-case of ZARA

    Magister-uppsats, IHH, Centre of Logistics and Supply Chain Management

    Författare :Nastassia Povarava; Natalija Borovkova; [2012]
    Nyckelord :Supply Chain Flexibility; Uncertainty; Supply Chain Characteristics; Firm Performance; Textile Industry; Fast Fashion; ICA AB; ZARA.;

    Sammanfattning : Problem – The essential problem being analyzed in the research paper is the methods of improving supply chain flexibility under certain circumstances and constrains that are imposed on the company. Purpose - The paper aims at providing suggestions on improvement of supply chain flexibility for ICA AB (Clothing) based on comparative analysis on sub-case study of ZARA. LÄS MER

  5. 5. Postponement in Retail Supply Chain Management : A systematic data gathering survey

    Master-uppsats, IHH, Centre of Logistics and Supply Chain Management; Internationella Handelshögskolan

    Författare :Peter Nendén; Avdyl Shala; [2012]
    Nyckelord :Postponement; Flexibility; Supply Chain Management; Retailing;

    Sammanfattning : Postponement as a tool of creating flexibility is not a new concept. It traces back in literature to the 1950’s but was mainly argued as a method useful for manufacturing. LÄS MER