Sökning: "Offshore Windfarm"
Visar resultat 1 - 5 av 6 uppsatser innehållade orden Offshore Windfarm.
1. The Paradigm Shift for Substations Technology within Wind Power Applications from Onshore to Floating
Master-uppsats, KTH/Skolan för elektroteknik och datavetenskap (EECS)Sammanfattning : Floating wind turbines are attracting more attention as more than three-quarters of the total offshore technical potential is located in deep water, leading to a growing trend in floating wind farm projects. Consequently, it becomes necessary to develop Floating Offshore Substation (FOSS) to step up voltage and efficiently transmit power to the shore with minimal losses. LÄS MER
2. Green hydrogen production in SE4, a business case for large-scale green hydrogen in SE4
Master-uppsats, Lunds universitet/Institutionen för energivetenskaperSammanfattning : As the greenhouse gas emissions keep on increasing the need for solutions to help reduce emissions across all sectors has never been greater. The European Union has pointed out green hydrogen as a step in increasing the sustainability of the energy sector in Europe. LÄS MER
3. Logistics strategy optimization for offshore windfarms with power purchase agreement
Master-uppsats, KTH/Skolan för industriell teknik och management (ITM)Sammanfattning : Offshore wind is on the road to become commercially viable and competitive means for large-scale electricity production. This new industry is expected to occupy a major role in the energy transition. LÄS MER
4. Power Loss Evaluation of Submarine Cables in 500 MW Offshore Wind Farm
Magister-uppsats, Uppsala universitet/Institutionen för geovetenskaperSammanfattning : The main objective of this thesis is to develop a new methodology to evaluate the transmission cable losses of wind-generated electricity. The research included the power loss variations of submarine cables in relation to the line length, cable capacity and the transmission technology in an offshore wind farm having a capacity of 500 MW. LÄS MER
5. OFFSHORE WIND POWER INVESTMENT MODEL USING A REFERENCECLASS FORECASTING APPROACH TO ESTIMATE THE REQUIRED COSTCONTINGENCY BUDGET
Magister-uppsats, Uppsala universitet/Institutionen för geovetenskaperSammanfattning : Forecasting capital expenditures in early stages of an offshore wind power project is aproblematic process. The process can be affected by optimism bias and strategicmisrepresentation which may result in cost overruns. This thesis is a response to issuesregarding cost overruns in offshore wind power projects. LÄS MER