  1. 1. Förbikoppling av stationer vid reinvesteringsprojekt i transmissionsnätet

    Uppsats för yrkesexamina på avancerad nivå, Uppsala universitet/Elektricitetslära

    Författare :Aron Johanson; [2023]
    Nyckelord :Mobile integrated gas-insulated switchgear; Elförsörjning; Förbikoppling; Kraftsystem; Ledningssäng; Nätstation; Nätutveckling; Reinvestering; Stationsförnyelse; Ställverk; Svenska kraftnät; Transmissionsnät;

    Sammanfattning : Svenska kraftnät is responsible for the operation and development of the Swedish transmission grid. A large number of substations in the transmission grid are approaching their expected service lifetime and must be renewed in the coming years. When renewing substations, total and partial outages in operation are often unavoidable. LÄS MER

  2. 2. Optimerad sandwichvägg i prefabricerad betong

    Uppsats för yrkesexamina på grundnivå, Linnéuniversitetet/Institutionen för byggteknik (BY)

    Författare :Majed Alsmail; Baqer Rubaij; [2023]
    Nyckelord :sandwich elements; thin concrete slabs; outer concrete layer; anchoring; anchoring systems; granular rupture in outer layer; anchor pull-out; adhesion; outer layer failure; loads; reinforcement; recesses; sandwichelement; tunna betongskivor; yttre betongskiva; förankring; förankringssystem; konbrott i yttre skivan; bygel utdrag; vidhäftning; brott i ytterskiva; belastningar; armering; ursparningar;

    Sammanfattning : As part of the work in this project, a literature review is conducted to determine the optimal thickness of the outer concrete layer in prefabricated concrete sandwich elements. These elements are used as exterior walls in buildings and consist of a load-bearing inner concrete layer, an intermediate insulation layer, and an outer concrete layer that forms the building's facade. LÄS MER

  3. 3. A study investigating the factors that causes delays in construction equipment projects in UX/HMI area

    Master-uppsats, KTH/Väg- och spårfordon samt konceptuell fordonsdesign

    Författare :Shivalika Shivalika; [2023]
    Nyckelord :Construction equipment projects; delays; User Experience UX ; Human-Machine Interface HMI ; Volvo Construction Equipment; qualitative analysis; quantitative analysis; project management; communication; collaboration; Produktutvecklingsprojekt; arbetsmaskiner; förseningar; användarupplevelse UX ; människa-maskin-gränssnitt HMI ; Volvo Construction Equipment; kvalitativ analys; kvantitativ analys; projektledning; kommunikation; samarbete;

    Sammanfattning : This research study investigates the factors contributing to delays in construction equipment projects, specifically in the User Experience (UX) and Human-Machine Interface (HMI) area, with a particular focus on projects conducted at the company Volvo Construction Equipment. The study incorporates a literature review, a mixed-methods approach combining qualitative and quantitative analysis, and in-depth discussions. LÄS MER

  4. 4. Alternative traction system for road-rail vehicles

    Master-uppsats, Lunds universitet/Innovation

    Författare :Jakob Runevad; [2023]
    Nyckelord :Product development; electric traction; construction equipment; road-rail vehicles.; Technology and Engineering;

    Sammanfattning : Excavators have traditionally been diesel driven with hydraulic actuators, but with the ongoing electrification of vehicles, smaller electric excavators are getting more common. Larger electrical excavators are still in a prototyping or early production stage but can be expected to grow. LÄS MER

  5. 5. Extreme renovation of concrete buildings

    Master-uppsats, KTH/Betongbyggnad

    Författare :Simon Hardo; Daniel Maher; [2023]
    Nyckelord :;

    Sammanfattning : The global climate crisis and the need to reduce carbon emissions have brought attention to the construction and real estate sector, which has a significant environmental footprint. However, many real estate developers opt for demolition and new construction instead of renovating existing buildings due to challenges such as low floor heights and stringent sustainability requirements. LÄS MER