  1. 21. Climate change impacts on water resources of the Ganges : Suitable adaptation options for agriculture in the Indian-Himalayan region

    Master-uppsats, KTH/Industriell ekologi

    Författare :Hedvig Winther; [2017]
    Nyckelord :Climate change; water flows; Indian-Himalayan region; Ganges; adaptation; hydro-climatic modelling; stakeholder participatory methods; Klimatförändringar; vattenflöden; Indiska Himalaya; Ganges; anpassning; hydroklimatisk modellering; intressentdeltagande metoder;

    Sammanfattning : Climate change is affecting several environmental factors and together with socio-economic changes put high pressure on water resources. Climate change manifest itself through increasing temperatures and changes in precipitation patterns and intensities, with knock-on effects on hydrologically-relevant parameters such as water flows, evapotranspiration rates, glacial melt etcetera, all of which have already been observed in the recent past and are predicted to continue in the future. LÄS MER

  2. 22. Facilitating the working process and documentation of DES projects

    Master-uppsats, Lunds universitet/Förpackningslogistik

    Författare :Caroline Svensson; Isabella Tehler; [2016]
    Nyckelord :Discrete event simulation; facilitation of the DES project process; DES framework; simulation of complex manufacturing systems; reducing simulation project lead time; Technology and Engineering;

    Sammanfattning : Background: Following a growing global competition, complexity, flexibility and product variability of manufacturing systems are increasing. This has led to improvement projects becoming more difficult to carry out. LÄS MER

  3. 23. Shorter project lead times in construction

    Master-uppsats, KTH/Fastigheter och byggande

    Författare :Karin Bergstrand; Viktor Appel; [2016]
    Nyckelord :Lean Construction; Value Stream Mapping; Waste; Flow efficiency; Construction Logistics; Supply Chain Management in Construction; Scheduling; Buffers; Variability; Lean Construction; Value Stream Mapping; Waste; Flow efficiency; Construction Logistics; Supply Chain Management in Construction; Scheduling; Buffers; Variability;

    Sammanfattning : The manufacturing industry has made an extensive journey through the last century when it comes to increasing productivity. Results in the construction industry end up far behind manufacturing and do not show anywhere near the same efficiency increase, improved quality or decreased costs. LÄS MER

  4. 24. Towards a Feasible Production Strategy: The Development of a Lead-Time Practice at a Chemical Producer

    Master-uppsats, Lunds universitet/Teknisk logistik

    Författare :Jesper Tempel; Oliver Flinck; [2016]
    Nyckelord :Lead-times; Production Planning; Campaign Planning; Cyclical Production Scheduling; High Grade Speciality Chemical Market; Technology and Engineering;

    Sammanfattning : ChemCo is a high quality producer in the speciality chemical market, a market characterised by complex production and high variability. With limited system-support and limited data quality, delivery accuracy suffered, and so did production efficiency. LÄS MER

  5. 25. Intern processkvalitet Region Bygg Mellersta : Totalkvalitetsgranskning på en byggregion i Peab Sverige AB

    Uppsats för yrkesexamina på grundnivå, Karlstads universitet/Fakulteten för hälsa, natur- och teknikvetenskap (from 2013)

    Författare :Helena Anshammar; [2016]
    Nyckelord :Total quality; Peab; internal function; own controls.; Totalkvalitet; Peab; internverksamhet; egenkontroller.;

    Sammanfattning : Sammanfattning   Studiens syfte var att bidra till framtidens kvalitetsarbete i byggbranschen och att utveckla arbetet med kvalitet. I studien kartläggs om det finns faktorer som påverkar kvaliteten i större utsträckning än andra faktorer. LÄS MER